Insite - University of Warwick Intranet

Site logo

Network Risk - Saturday 9 January 2010

[c]

IT Services will carry out essential network maintenance from 8am to 3pm on Saturday 9 January 2010.

Essential services will be transferred to the Uninterruptible Power Supplies (UPS) during this period so the campus network should not be affected. However, the network will operate at increased risk during this time, so all data should be saved before hand and systems should be shut down wherever possible.

Please note that non-essential supplies contained within these buildings will not be interrupted.

Page contact: Samuel Boulby Last revised: Fri 20 Nov 2009
Back to top of page
 

Web site search

People search

News

News.