Skip to main content

Draft Report

Glossary 10.03.07

Glossary 08.3.07

Glossary to be referenced

 

Draft report for Mark & Phil

Draft Summart Report 12/03/07 [Final]

Draft Summary 11/03/07 - To be Completed

Glossary

iains inspection cell layout - To be Completed

dannys inspection cell layout - To be Completed

dannys inspection cell layout summary - To be Completed

Overpacking Cell [Tech Report]

Inspection Method - Nick [Tech Report] [To be Compiled with Tim]

Visual Inspection - Tim [Tech Report] [To be Compiled with Nick]

Logistics [Tech Report]

Risk Assessment [Tech Report]

Waste Package Monitoring [Tech Report]

 

 

 

 

TCSC10801 (from mark 06/03/07)

TCSC10791 (from mark 06/03/07)

TCSC10561 (from mark 06/03/07)

TCSC10421 (from mark 06/03/07)

AESS10671 (from mark 06/03/07)

reworking of ILW (from mark 06/03/07)

416793v11 cost estimates

tech note template (from mark 06/03/07)

Business and Management (draft)

Agenda 5th march

useful statastics 28.2.07

Glossary 03.3.07

Glossary 28.2.07

Overpacking Cell Layout 01/03

Overpacking Cell Layout 27/02

Inspection Methods/04/03

Inspection Cell - Layout 26.2.07 (in progress) 

Inspection Cell - methods of inspection 26.2.07 (in progress) (this version includes Visual inspection and 3D mapping)  

dannys layout ideas 26/02

management_-_our_project_group_23.2.07

Logistics Technical report thingy (roughly 16.2.07)

Overpacking by Kevin (23/02)

Overpacking by Carl (23/02)

Waste monitoring tech report 11.2.07

Waste Package Monitoring 11/03/07 (Nirex Template) 

 

 

Glossary 26.2.07

useful statastics 23.2.07

Glossary 23.2.07

Glossary 22.2.07

Inspection Cell - methods of inspection 16.2.07 (this version includes Visual inspection and 3D mapping)

Inspection Cell - methods of inspection 16.2.07 (in progress) (this version includes Visual inspection and 3D mapping)

useful statastics 16.2.07

Visual Inspection 14.02.07

Visual Inspection 13.02.07

 

Paint drawing of 500L drum 11.2.07

Functional Specification (submitted to Mark) 22.1.07